JETRAY / Battery engineering & sourcingShenzhen, Chinasale1@jetray.cn ↗
JETRAYLiFePO4 Battery Packs
QUALITY & DOCUMENTATION

Evidence should match the exact product.

Use a model-specific document checklist. Certification, test and transport requirements depend on the product, application and destination.

Review the scope before the badge.

The Jetray website publishes factory and certification information. A website statement or logo is not a substitute for the current report covering the quoted model and configuration.

Battery test equipment shown on the Jetray factory page

Official website factory photograph; test capability for a quoted model requires confirmation.

Approved specification

Check the model, revision, voltage limits, capacity conditions, protection behavior and environment.

Drawing and bill of configuration

Confirm size, tolerances, cell model, protection board, connector, pinout and permitted substitutions.

Test and transport documents

Ask which current reports apply to the exact cell or finished pack, and which documents the shipment and destination require.

Traceability and change control

Agree lot identification, sample approval, incoming acceptance and notification of a material configuration change.

Questions to put in the RFQ

  • Which exact product model and revision does each supplied report cover?
  • Is the document for a cell, a module or the complete pack?
  • Are the applicant, test laboratory, report date and tested configuration identifiable?
  • What validation belongs to the equipment manufacturer or installation integrator?
A useful conversation starts with a specification

Tell us what your equipment needs.

Share the load, dimensions and intended use. Ask for a current model specification and a project review.

Discuss your project

Product comparison